Guam EPA Board of Directors Regularly Scheduled Meeting Canceled

The Guam Environmental Protection Agency Board of Directors’ regularly scheduled meeting for April is canceled due to lack of quorum.
The Guam Environmental Protection Agency Board of Directors’ regularly scheduled meeting for April is canceled due to lack of quorum.
Keep our island CLEAN – Report illegal dumping!
CLICK HERE TO SUBMIT A BASIC REPORT
CLICK HERE TO SUBMIT PHOTOS & VIDEOS WITH YOUR REPORT – Google Sign-In Required
In case you missed our Construction & Industry Forum on March 29, 2023, you can click on the links below to access presentations about Guam EPA’s construction permitting process:
In Guam, the use of onsite wastewater disposal systems commonly referred to as ”septic systems,” is regulated through a number of laws and regulations. These laws and regulations cover specific requirements for the permitting, design and construction of septic systems in Guam. Guam EPA has developed this FAQ to help you understand the application of various requirements to the design, permitting, and construction of a septic system for a single family dwelling.
Guam Business License and Permit Center Agency Window Hours:
Monday – Friday
8AM – 12PM • 1PM – 5PM
17-3304 Mariner Avenue Tiyan Barrigada, Guam 96913
One Stop Permit Window Hours: Mon-Fri: 8AM - 12PM • 1PM - 5PM
671.300.4751 671.300.4752
© 2023 Guam Environmental Protection Agency Ahensian Pruteksión Lina'la’ Guåhan. Built using WordPress and the Mesmerize Theme